Saturday, 19 April 2025

8th Bass Strait Voyage

 8th Bass Strait Voyage 

Just after dawn on April 13, 2025 suitable weather conditions lead to launching Voyager 2.8 from Flinders, Victoria. The intended destination was Torquay, but rougher than expected conditions later that cut the journey short.

Launch at Flinders Beach, after dawn.


Voyager departed Western Port Bay well pushing against a flooding tide, with Northerly wind of around 10 knots building to over 20 knots.


Voyager successfully exited Western Port Bay into Bass Strait, with northerly wind building to 20 knots.

Wing Sail damaged several miles out, approaching Cape Schanck waypoint.




Recovery from the rocks near Cape Schanck several days later.

Voyager lost control and drifted on the rocks during the next day, and was recovered two days after that.

She suffered a lot of damage on the rocks. The vent/antenna tube was broken off and the equipment housing filled with seawater, destroying the electronics. 
But the SD Card was still good !!

Analysis of the logs on the SD Card provided hints about what happened at sea.

It appears that the rough conditions with over 20 knots of wind combined with tidal movement caused breaking waves that tumbled the vessel, and damaged the tail on the wing sail.
It appears that the vessel lost drive from the sail, most likely due to the tail being damaged.

This is the second time the vessel has come ashore in Bass Strait due to suspected sail damage.

The logs showed that all of the electronics continued to function until a few hours after coming ashore on the rocks.


Conclusions

Its time to change the Wing Sail construction. Printed ABS components, with PVC film covering is ok in protected waters like lakes or Port Phillip.
But it is not suitable for Bass Strait.

Next Steps

My plan now is to develop new Wing Sail design and use new construction methods.
  1. I've always used NACA0018 foils. I plan to test designs using Eppler 169 foils due to their improved behaviour with the low Reynolds numbers encountered with small sailing drones. (calculated based on 12 knots of wind, over a chord length to 300mm to 450mm)
  2. The Tail assembly is fragile. I plan to develop a design where the tail is removed and the trim tab is included within the trailing edge of the wing sail to improve the robustness of the assembly.
  3. Effectively eliminating the tail will require the pivot point of the sail to move forward. A typical symmetrical foil is balanced about a point approximately 25% of chord from leading edge. 
    When a separate tail is added it ensures the  assembly will "weather cock".
    Without a tail, it will be necessary to move the pivot forward to ensure the wing sail continues to "weather cock". 
    I plan on commencing with 20% of the chord as the pivot point.
  4.  Initially development of the new sail design will be done using the same 3D printed ABS components with PVC film. This allows for rapid construction and is suitable for lake testing.
    The plan is that next time Voyager sails in Bass Strait the wing sail will constructed using foam core covered with fibre glass for increased strength. This is similar to the construction of the hulls, which has been very successful.
    I use 2 ounce fibre glass fabric with West System epoxy resin, over high density construction foam.

 





Magnetic Coupling for Steering V3

 Magnetic Coupling for Steering - V3

The magnetic coupling used to transmit the steering servo's torque to the rudder through a waterproof barrier has been quite successful.
But the design has evolved over the years, and it is time revisit the topic to explain the latest design.
I had previously used an array of a 8 magnets, 10mm x 3mm, per disk.

Magnetic Coupling Version 2 - new Magnet Layout


This worked fine on the smaller 1.2m vessel, but the larger 1.8m Voyager 3 was experiencing steering interruptions when the magnetic coupling would be overcome, and break free.
More torque was required in the magnetic coupling for the larger vessel.

Review of the V2 magnetic coupler

These images show the version 2 coupler that was used extensively on the smaller 1.2m sailing drone. 
When used on the larger 1.8m sailing drone, Voyager 3, it proved to provide inadequate torque.

When the relative torque was measured using a spring scale, it broke free at around 200g.

Version 2 Magnetic Coupler - 8 magnets 56mm diameter - magnet side.


Version 2 Magnetic Coupler - 8 magnets - other side.


V2 Magnetic Coupler - 12 Magnet

To increase the torque that could be transmitted by the coupler I tried adding an additional set of magnets, totalling 12 magnets per disk, and increased diameter of 76mm.

This worked ok, but in practice the increased diameter of the disk was going to require more clear space in the equipment bay, which would require shifting other components, and became too difficult.

When the relative torque was measured using a spring scale, it broke free at around 320g.

Version 2 Magnetic Coupler - 12 magnets 76mm diameter - magnet side

Version 2 Magnetic Coupler - 12 magnets - other side.

V3 Magnetic Coupler - 2 Magnets 

The next step was to employ larger magnets, 20mm x 4mm, on the same size disk of 56mm diameter.
This configuration yielded a significant increase in the torque that could be transmitted, within the same space. 

When the relative torque was measured using a spring scale, it broke free at around 525g.

This increase in performance yielded a practical result for the Voyager 3.
I have now retrofitted the smaller Voyager 2 with the same design of Magnetic Coupler. 


Version 3 Magnetic Coupler - 2 magnets 56mm diameter - magnet side


Version 3 Magnetic Coupler - 2 magnets - other side






View of 2-Magnet Coupler in the Voyager 3 Equipment Housing




View of 2-Magnet Coupler in the Voyager 3 Equipment Housing



View of 2-Magnet Coupler in the Voyager 3 Equipment Housing


The new coupler design has proven so good, it has been retrofitted the smaller Voyager 2.

View of 2-Magnet Coupler retrofitted to Voyager 2, shown partially installed


Compass Interference

Of course stronger magnetic fields on a small sailing drone create problems for the magnetic compass.
The only solution is to increase physical separation until the magnetic interference with the compass reduces to a tolerable level.

The following images shows a simple test set up to observe the effects of the new Magnetic Coupler on the magnet compass located within the equipment housing.

It showed the interference dropped to reasonable levels once separation was increased by around 100mm to 200mm.

Testing for Compass Interference


 This was handled in Voyager 3 by adding an additional compass on the deck well forward of the equipment housing, but not too close to the magnetic disk used for the wing angle measurement, as shown in the following image:



New compass mounted away from magnets to reduce interference.



Thursday, 9 April 2020

First Long Distance Voyage - March 2020

The Voyage

In mid March 2020 Voyager 2.0 completed its first voyage in salt water. Voyage of 40 hours across Port Phillip in Victoria. A distance of around 30 miles. Completing a voyage of this distance was a good result, despite not sailing very well. But at least it made it, despite the problems.

This was about one or two weeks prior to isolation rules being stepped up in Victoria, where this would not have been permitted.

This article covers observations about the voyage. Subsequent articles will discuss the design adjustments to overcome the problems observed.
Stepping through the pre-launch checklist

I've learnt from my mistakes that a pre-launch checklist is important. There's nothing more frustrating than launching the boat and then realising that you've forgotten something (like installing the SD Card).

Voyager heads off into the evening at 8pm Saturday March 14, 2020.
The launch took place at dusk to ensure the boat would be well clear of the coast in daylight, to reduce the chance of passing by pleasure craft.

The actual course and the waypoints

The typical winds for the majority of the voyage were 10 to 20 knots south easterly.


Plot of positions from the Satellite Tracking.

The satellite position transmitter was programmed to send a position every 15 minutes. These positions are shown in the image above. The spacing gives a sense of the speed variations.


Shared View: Voyager 2.0 March 2020 - SPOT Tracking (findmespot.com)

The boat didn't quite make it to its intended destination. Mid-morning on the second day, travelling slowly with light winds, and about three miles from the finish, the boat was picked up by some passing fishermen in a half-cabin power boat. They phoned me and we arranged or a hand over at their boat ramp.
I thanked them for assisting with picking up the boat, but it was a pity that it wasn't allowed to complete the journey by itself. They were not to know that the boat did not need rescuing.


 
Voyager 2.0 just prior to being picked up
The hand-over.

A lot of data was recorded on to the SD card during this voyage. The recorded data is useful for analysing the performance of the boat and working out areas to be improved. Some of the interesting date plots are shown below.
The voyage was about 40 hours in duration or about 2400 minutes.

Cross Track Error

Unfortunately the boat went off course early in voyage, but did eventually recover.  The plot below show the Cross Track Error (CTE) in metres.
The plot highlights an error in the CTE calculation. The CTE calculation is based on the SIN of the angle between the rhumb line bearing and the current Bearing to Waypoint (BTW).  The angle is stored as an integer which means that the calculated CTE can be seen "stepping", rather than changing continuously.


Cross Track Error (metres)

Steering Servo Signal

The steering servo is standard RC servo, with a neutral of 1500us, with a full range from about 1100us to 1900us.
There are clear periods of the voyage when steering was easy and when steering was difficult. The periods with lots of large steering movements correspond to the periods when the boat was not on course.

Steering Servo Signal - microseconds

Rudder Servo Movements 

The Rudder Servo made approximately 100,000 movements over the 40 hours of the voyage. This is corresponds to about 2500 movements per hour. 
The number of movements per hour remains fairly constant over the whole voyage as shown in the plot below. But the amplitude of the movements does vary greatly depending on conditions, as shown by the image above.



Accumulated Rudder Servo Movements

Rudder and Wingsail Trim Tab Servo Movements per Hour

The next plot shows the quantity of movements in each hour for both the rudder servo and the wingsail trim tab servo, rather than accumulated movements.

If the vessel is sailing well and holding course on one tack, then there should no movement in the wingsail trimtab. This was the case for a few hours. This can be seen in the blue line plot below.
The wingsail trim tab movements at other times are related to waves rolling of the vessel when reaching, or due to rolling while running downwind.

Rudder and Wingsail Trim Tab Servo Movements per Hour

Power Consumption - Battery Voltage and Current

The battery is 2S LiPo battery made up of twenty 18650 cells. 
Fully charged the battery voltage is 8.4V and it may discharge down to about 6.0V
The rate of discharge appears to be fairly constant, and actually seems consistent with tests performed on land.







Speed Over Ground

SOG is measured in metres per second. One metre per second is approximately 2 knots.
The first few hours shows the boat averaging around 0.5m/s (1 knot) in reaching conditions with wind of about 15 knots.
An increase in wind speed to about 20 knots lifted the average speed toward 1m/s, almost 2 knots. Then as the wind faded in the later part of the voyage the average speed dropped to well under 0.25m/s, less than  0.5 knots.



Temperature within the Electronic Housing

The plot of temperature clearly shows the diurnal cycle, with overnight lows of around 17°C and daytime highs of over 35°C inside the equipment housing.
The overnight lows are very close the published water temperature for Port Phillip at this time.
The daily highs are well above the outside air temperature. The equipment housing is clear plastic and the interior clearly heats up in the direct sunlight.




COG, BTW and CDA

Course Over Ground, Bearing to Waypoint and Course Deviation Angle.
The yellow plot of COG highlights the poor course keeping during the voyage. It clearly shows long periods of time spent off course. It does eventually recover and get back on course.
The blue plot of BTW clearly shows the passage past three waypoints, with the third waypoint involving a more noticeable course change from about 230°T to about 285°T.
As each waypoint is approached and closely passed, the BTW goes to extreme values until it goes behind the beam of the boat, and mission steps to the next waypoint.






Note: This is part of the ongoing development of a low cost autonomous oceangoing sailing drones, utilising a self-trimming wingsail. This is the Voyager series of sailing drones.

Monday, 5 August 2019

Waterproofing a Standard Servo

Waterproofing a Standard Servo (well, splash proofing it at least)

The post describes a process I used to protect a standard servo against water.
The servo was a Hitec 919, but most servo use the same basic construction 
The main entry points for water below the mounting flange are protected by a spray coating.
The splined shaft is protected using grease on the inside of the casing and an O-Ring on the outside.

Details of the steps follow.

Step 1.
Partially disassemble the servo by removing the 4 screws from the bottom, and remove the top and bottom casings.


Step 2.
Slide out the Motor and PCB assembly.
Apply a Conformal Coating to the PCB to improve its resistance to water.
I didn't spay it directly, because I wanted to avoid any moving parts, but rather sprayed a few millilitres into a small container, and applied it to the PCB using a wooden ice cream stick.

Step 3.
Apply grease to the bearing area just below the splines.


Step 4.
Reassemble the servo.

Step 5.
Add an O-ring  (1mm by 4mm) to splines.

Step 6.
Use a file on the bottom of the servo arm splines, to increase the gap between the top of the servo housing and the servo arm.
The gap needs to be increased so there is enough room for the O-Ring when the Servo Arm is screwed down, without it being too tight ,and causing undue friction.


Step 7.
Apply a protective spray coating lower part of the servo below the mounting flange.
I used masking tape and Red Plasti Dip.

Unfortunately, I forgot to take a photo before installing the servo back into the Wingsail, and this photo is not good.



Sunday, 28 July 2019

Waterproof Steering Coupling - Magnetic Coupling

Waterproof Steering Coupling - Magnetic Coupling

A magnetic coupling is used to transmit the Steering Servo movement out of the water tight compartment to the rudder pushrod.

This has been successful.
In the correct configuration, all six magnet pairs are engaged.
It can suffer the problem that the outside disk can be forced to detent in the wrong place, one sector in either direction.
In this position, two magnet pairs are attracting and four are repelling. 
It is a semi-stable state, but it can easily be pushed back to the corrected alignment.

The pattern of magnetic orientation has an effect on behaviour, and more study is required to determine the best arrangement and quantity of the magnets.
Perhaps less magnet pairs are better, because the angle to next detent point would be greater with a reduced number of magnets.
This would need to be balanced against the reduced magnetic coupling with the reduced number of a magnets.


Lower Magnetic Coupling Disk fitted to the Rudder Servo




Complete Magnetic Coupling Assembly


Wednesday, 25 May 2016

Voyager 1 - The Voyage

Launch May 1st 2016 - Woodside Beach, Victoria

This launch of Voyager 1 was successful. Follow its path here. The prevailing weather conditions were good for taking the boat well offshore. The offshore winds were due to continue for at least a week, with a series of westerly fronts coming through Bass Strait. This should have been good for fulfilling the plan of getting boat well offshore and down into the southern Tasman Sea. 

Setting up on the Beach
Final Preparations

The Launch
 
The boat sailed well for the first 8 hours in a SSW direction.
This was ahead of the first of a series of westerly fronts coming in the next week.
The impending westerly wind should have caused the boat to change course from SSW to about WSW.
But it appears to have headed NW instead; and it appeared to travelling upwind at times.



http://ww2.acaciacs.com.au/voyager1/
The First Two Days
 
This pattern of movement implies that the boat stopped moving with relation to the wind, and instead started moving with the currents instead.
This implies that the mast was broken and the sail is in the water helping to act as a sea anchor, causing the boat to move with the current, and not be influenced by the wind.
It appears that mast was broken when the first front came through on the evening of May 1st 2016.
The weather fronts caused significant damage to properties around Melbourne on the evening of the Launch. News reports of the weather can be seen on The ABC and in The Age.

What was learnt ?
It is an assumption, that the mast is broken, but its hard to imagine another explanation.
The mast was mostly un-stayed, 1m long, 12mm aluminium tubing, with a wall thickness of about 1mm. If it broke, then it was clearly not strong enough for the boat in the conditions experienced.
It will be necessary to consider ways of mitigating this problem in future offshore model boats.

The Flinders Current
The boat is no longer a sailing vessel headed into the southern Tasman Sea as planned. Instead, it is now a drifting buoy, with a Satellite tracking facility.
For the first few days, it travelled fairly distinctly up the Gippsland Coast in a NW direction.
This corresponds to part of the current known as the Flinders Current.
The Flinders Current flows in easterly direction across the south of Australia. It partly flows through Bass Strait, and partly flows up the Gippsland Coast.
This what is moving the boat for the first week.

End of Week 2: May 15, 2016
After 2 weeks at sea, the boat has continued to travel in NW direction up the east Australian coast. At this time it was located over 350km offshore, just south of Sydney.
It movement is under the influence of East Australian Current (EAC). The EAC flows south down the east coast of Australia, close to the mainland down to about the latitude of Sydney. It predominantly flows offshore to the east, at about that point, heading into the Pacific. The edges of the EAC are dominated by eddies that cause significant wandering and circling of the current flow.

May 25 - 25 Days at Sea
After 25 days, the boat is about 1000km from the launch point and about 400km offshore, east of Newcastle. It appears to be on course to drift passed Lord Howe Island and continue into the Pacific. We'll see.
The SPOT GPS Satellite tracking facility is still going well. Without it, We'd have nothing.

Voyager 1 - The Launch Attempts - Learn Something New Every Time

First Launch Attempt 14 January 2016  - Near Pambula, NSW

This launch failed.
Primarily because, the weather conditions did not provide enough of an off-shore breeze for the boat sail away from shore.

The boat was damaged by breaking waves.
This provided guidance on changes in the design and construction of the boat.
The damage incurred was that the Aluminium Fin bent 90 degrees when the boat was caught in a breaking wave. 

What was Learnt ?
The Fin bent so easily, that is fortunate that the launch failed. If the boat had successfully sailed offshore, the fin would have bent in the first storm, leaving the boat lying on its side in the water. In this condition, the SOPT GPS satellite tracking facility would not have worked very well, the boat would have been effectively lost.

The Wind Vane rotated on the shaft when the boat was engulfed by the breaking wave. This is equivalent to changing the course setting of the Vane Steering gear. Hence if a reliable sailing course is to be maintained, steps must be taken to prevent the Wind Vane from rotating on the shaft.  



What changes were made ?
The fin was strong enough to support a static load, but bent easily under the dynamic load of a breaking wave.
The fin was reduced in length to about half the original length.

The Wind Vane mounting arrangements were initially fabricated in 3D printed ABS plastic.

Version 1 - Almost Fully 3D Printed Vane Steering Gear

The 3D printed plastic bosses had threads cut for the 5/32" set screws that were intended to lock the bosses on to the brass shaft.
These worked ok, and could resist quite high static torque loads, but in the conditions experienced with a breaking wave, they easily slipped from the set position.

Version 2 - More Metal Components added




The second version, included threaded metal components. This allowed much torques to be applied to the set screws to resist slipping.



















Second Launch Attempt February 15 2016 - Woodside Beach, VIC
This launch was partly successful.

The boat sailed well in a light offshore breeze, and launch appeared successful.

An Apparently Successful Launch at Woodside Beach
The first satellite signal was received after about 20 minutes when the boat was about 1 kilometre offshore. But 4 hours later the next signal showed the boat was on the beach several miles up the coast.

Satellite Position Signals showing the Launch from Woodside Beach and then running ashore several miles up the Beach.

Washed up on the Beach like a dead Sea Gull


The boat was retrieved for reworking in preparation for the next attempt.


What Went Wrong ?
My assessment of the weather was wrong. I had assumed the offshore breeze would continue for a much longer period and get the boat further offshore into the prevailing breeze.
But instead, it end up back on the beach.

What was Learnt ?
The weather predictions must not be marginal in any way. If there is any uncertainty, then its best not to launch.

There was some damage when boat came ashore. The polycarbonate Wind Vane was broken, the brass Wind Vane shaft was slightly bent, and the Wind Vane bronze bearing was dislodged from its housing.


What changes were made ?
The vertical shaft for Vane was changed from brass to stainless steel. This was done because of concerns about the brass shaft bending. Stainless steel is almost double the hardness of brass. Hence the replacement stainless steel shaft is much more resistant to bending.

The Wind Vane was made using 2mm polycarbonate sheet. This was broken during the beaching. It was replaced with 1mm carbon fibre sheet. This is considerably stronger and also about 60% of the mass of the polycarbonate sheet.
The weight reduction of the Wind Vane required a rebalancing of the vane assembly, and hence their was a corresponding reduction in the lead counterweight.



Saturday, 21 May 2016

Voyager 1 - First Sea Trial on Port Philip

The first sea trial of Voyager 1 was performed on Port Philip.
The winds were light and sea was calm, which does not represent typical ocean conditions.
It sailed well and the Vane Steering performed well in the light conditions.

Voyager 1 on Port Philip in light winds

Voyager 1 with Go Pro style Camera on board

 

Voyager 1 - The Build

Voyager 1 was planned as a quick build and launch of a relatively uncontrolled boat to test the out various technologies and design ideas in the lead up to the development of more sophisticated boats.

Voyager 1 is a 1.5 metre sailing vessel that used Vane Steering to control its direction. The Vane Steering was set to steer the boat almost downwind, with the wind about 20 degrees on the starboard quarter.

The aim was to launch the boat from the south-east corner of Australia at a time when the westerly winds would take it out into the Tasman Sea in a south westerly direction. Hopefully it would travel south of New Zealand in the Southern Ocean.

The actual path of Voyager 1 can followed here ww2.acaciacs.com.au/voyager1

The hull for Voyager 1 was not specially built for this task, It is actually a third-hand hull from a catamaran. It was built by Doug Hemm, then given to Jeff Gray, and then given to me (All members of Royal Yacht Club of Victoria).

Third-hand Catamaran Hull
The first task was to strip off the deck and remove centreboard in preparation for fitting out the hull as a monohull.
Balsa bulkheads were fitted, and an aluminium frame was added which incorporated a centerplate casing.
Mounting points were added for mounting the Vane Steering gear and also for securing payload. The payload is the modified SPOT GPS satellite tracking system described in an earlier posting here.
Hull fitted with New Aluminium Centreplate Frame, Bulkheads and Equipment Mounts  
A small hull will always leak.
If it is to remain afloat for months, then it must be intrinsically buoyant, regardless of leaks. This was handled by using expanding foam filler.
Expanding foam is not the best foam to use for buoyancy. It is not a closed cell foam, and if structure surrounding the foam flexes, then the foam will crush and become water-logged.
In this case, there weren't a lot of choices and so expanding foam was used.
Expanding Foam added before trimming back
Most of the detailed components in Voyager 1 were fabricated in ABS plastic using 3D Printer. The images below show the Vane Steering Gear and the equipment mounts mostly fabricated in ABS plastic.
Version 1 of the Vane Steering Gear and Rudder
Version 2 of the Vane Steering Gear


Voyager 1 with the Extra Long Keel, prior to first Sea Trial